Crew Accommodation Assembly
Berthing, messing and sanitary outfit supporting a crew of about 4,500 including the air wing — a floating town’s worth of habitability. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
5 top-level lines · 5 rows shown · 9,520 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Berthing Module | aircraft-carrier-berth | 4600× | 4,600 | — | part |
| 2 | Galley Equipment Unit | aircraft-carrier-galley-equipment | 120× | 120 | — | part |
| 3 | Head Fixture | aircraft-carrier-head-fixture | 1200× | 1,200 | — | part |
| 4 | HVAC Terminal | aircraft-carrier-hvac-terminal | 2800× | 2,800 | — | part |
| 5 | Fastener Set | fastener-set | 800× | 800 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |