BOMwiki the bill-of-materials encyclopedia

Envelope Assembly

Pressurised fabric hull of about 5,700 m3 holding the helium lifting gas. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

6 top-level lines · 10 rows shown · 46 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Envelope Panel airship-envelope-panel 30× 30 part
2 Ballonet 4 parts airship-ballonet 2 5 assembly
2.1 Ballonet Fabric airship-ballonet-fabric 2 part
2.2 Air Valve airship-air-valve 4 part
2.3 Blower Motor blower-motor 2 part
2.4 O-Ring Set oring-set 2 part
3 Catenary Curtain airship-catenary-curtain 2 part
4 Nose Cone airship-nose-cone 1 part
5 Helium Valve airship-helium-valve 2 part
6 Rip Panel airship-rip-panel 1 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks