BOMwiki

Top Guide Assembly

Sourcing — likely vendors

Real suppliers (🇮🇳 🇸🇬 🇨🇳); price, MOQ & lead time are estimates
VendorHQSpecialtyEst. unit priceMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg $11 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg $8.43 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg $10 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg $10 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg $8.91 1,000 pcs 6–10 wks

Top rail guide rollers steadying the mast against the overhead guide rail. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

1 top-level line · 3 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Top Guide Roller 2 parts asrs-stacker-crane-top-guide-roller 4 2 assembly
1.1 Roller Wheel asrs-stacker-crane-roller-wheel 4 part
1.2 Ball Bearing ball-bearing 4 part

Used in 1 assembly