BOMwiki the bill-of-materials encyclopedia 27,966,275 parts mapped · 127,489 items

Accommodation & Outfit Assembly

Berthing, galley, mess and sanitary spaces for ~135 crew on 90-day patrols, plus the joiner panels and outfit hardware lining every compartment. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

5 top-level lines · 10 rows shown · 50,991 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Berth Module attack-submarine-berth-module 110× 110 part
2 Galley attack-submarine-galley 1 part
3 Seat Assembly 5 parts seat-assembly 40× 40 7 assembly
3.1 Seat Frame seat-frame 40 part
3.2 Seat Foam seat-foam 80 part
3.3 Seat Cover seat-cover 40 part
3.4 Seat Motor seat-motor 80 part
3.5 Seat Heater Mat seat-heater 40 part
4 Sheet Metal Panel sheet-panel 2600× 2,600 part
5 Outfit Small Hardware attack-submarine-outfit-smallparts 48000× 48,000 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks