Pit Casing Assembly
Galvanized steel caisson cast into a concrete foundation; it guides the cylinder, transfers crash loads into the ground, and drains surface water. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Pit Caisson | automatic-bollard-caisson | 1× | 1 | — | part |
| 2 | Guide Liner Tube | automatic-bollard-liner-tube | 1× | 1 | — | part |
| 3 | Top Frame Collar | automatic-bollard-top-frame | 1× | 1 | — | part |
| 4 | Drainage Kit | automatic-bollard-drain-kit | 1× | 1 | — | part |
| 5 | Anchor Reinforcement Cage | automatic-bollard-anchor-cage | 1× | 1 | — | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |