BOMwiki the bill-of-materials encyclopedia 27,966,200 parts mapped · 127,414 items

Gas Pretreatment Assembly

Chiller-dryer and adsorption beds that remove water, H2S, and siloxanes before the gas reaches compressor and membranes. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

5 top-level lines · 10 rows shown · 11 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Gas Dehumidifier 5 parts biogas-upgrader-dehumidifier 1 5 assembly
1.1 Gas Cooler biogas-upgrader-gas-cooler 1 part
1.2 Refrigeration Circuit biogas-upgrader-refrig-circuit 1 part
1.3 Demister Pad biogas-upgrader-demister 1 part
1.4 Coolant Pump coolant-pump 1 part
1.5 Pressure Sensor pressure-sensor 1 part
2 Condensate Trap biogas-upgrader-condensate-trap 2 part
3 Activated Carbon Filter biogas-upgrader-carbon-filter 2 part
4 Coalescing Filter biogas-upgrader-particle-filter 1 part
5 Gas Reheater biogas-upgrader-reheater 1 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks