Cable System Assembly
Wire rope, sheaves, and guide pulleys that transmit downward percussion from the walking beam to the drill bit, and upward return. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Drilling Cable | cable-tool-drill-rig-main-cable | 1× | 1 | — | part |
| 2 | Crown Sheave | cable-tool-drill-rig-crown-sheave | 1× | 1 | — | part |
| 3 | Cable Traveling Block | cable-tool-drill-rig-traveling-block | 1× | 1 | — | part |
| 4 | Cable Guards & Dampeners | cable-tool-drill-rig-cable-guards | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.10–$30 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| motherson.com ↗ | Noida, IN | Wiring harness & modules | 1,000 sets | 4–6 wks |
| 🇮🇳Polycab polycab.com ↗ | Mumbai, IN | Wires & cables | 1,000 sets | 4–6 wks |
| 🇨🇳Luxshare luxshare-ict.com ↗ | Dongguan, CN | Connectors & cables | 1,000 sets | 4–6 wks |
| 🇨🇳Hengtong hengtonggroup.com ↗ | Suzhou, CN | Cables | 1,000 sets | 4–6 wks |
| 🇮🇳Finolex finolex.com ↗ | Pune, IN | Wires & cables | 1,000 sets | 4–6 wks |