BOMwiki the bill-of-materials encyclopedia 27,966,200 parts mapped · 127,414 items

Chocolate Depositor Assembly

Pump and nozzle system dispensing precise volumes of chocolate into moulds. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

4 top-level lines · 27 rows shown · 72 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Gear Pump 4 parts chocolate-moulding-pump 1 4 assembly
1.1 Pump Body chocolate-moulding-pump-housing 1 part
1.2 Gear Set chocolate-moulding-gear-set 1 part
1.3 Inlet Port chocolate-moulding-pump-inlet 1 part
1.4 Outlet Port chocolate-moulding-pump-outlet 1 part
2 Pump Drive Motor 4 parts chocolate-moulding-pump-motor 1 25 assembly
2.1 Stator Assembly 3 parts stator-assembly 1 3 assembly
2.1.1 Stator Core (laminations) stator-core 1 part
2.1.2 Copper Winding copper-winding 1 part
2.1.3 Slot Insulation stator-insulation 1 part
2.2 Rotor Assembly 4 parts rotor-assembly 1 19 assembly
2.2.1 Rotor Shaft rotor-shaft 1 part
2.2.2 Rotor Core rotor-core 1 part
2.2.3 Neodymium Magnet neodymium-magnet 16× 16 part
2.2.4 Ball Bearing ball-bearing 1 part
2.3 Motor Housing motor-housing 1 part
2.4 Ball Bearing ball-bearing 2 part
3 Nozzle Bank Assembly 3 parts chocolate-moulding-nozzle-bank 1 17 assembly
3.1 Nozzle Manifold chocolate-moulding-nozzle-manifold 1 part
3.2 Nozzle Solenoid Valve chocolate-moulding-nozzle-solenoid 8 part
3.3 Dispensing Nozzle chocolate-moulding-nozzle-orifice 8 part
4 Temperature Jacket 3 parts chocolate-moulding-temperature-jacket 1 26 assembly
4.1 Jacket Piping chocolate-moulding-jacket-pipe 1 part
4.2 Jacket Heater chocolate-moulding-jacket-heater 1 part
4.3 Circulation Pump 2 parts chocolate-moulding-jacket-pump 1 24 assembly
4.3.1 Circulation Pump Body chocolate-moulding-circ-pump-body 1 part
4.3.2 Circulation Motor 3 parts + deeper › chocolate-moulding-circ-pump-motor 1 23 assembly

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks