BOMwiki

Hydraulic Power Pack Assembly

Sourcing — likely vendors

Real suppliers (🇮🇳 🇸🇬 🇨🇳); price, MOQ & lead time are estimates
VendorHQSpecialtyEst. unit priceMOQLead time
🇨🇳CATL
catl.com ↗
Ningde, CN Li-ion cell & pack maker $24 5,000 cells 8–12 wks
🇨🇳EVE Energy
evebattery.com ↗
Huizhou, CN Li-ion cell maker $22 5,000 cells 8–12 wks
🇮🇳Amara Raja
amararaja.com ↗
Tirupati, IN Batteries & energy $26 5,000 cells 8–12 wks
🇸🇬Durapower
durapowergroup.com ↗
Singapore Li-ion battery systems $28 5,000 cells 8–12 wks
🇨🇳BYD
byd.com ↗
Shenzhen, CN EV & battery manufacturer $19 5,000 cells 8–12 wks

PTO-driven main pumps feeding the pumping and boom circuits: tank, control valve bank, accumulator and oil cooler. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Hydraulic Pump concrete-pump-truck-main-pump 2 part
2 Hydraulic Reservoir concrete-pump-truck-hyd-tank 1 part
3 Control Valve Block concrete-pump-truck-valve-block 1 part
4 Hydraulic Accumulator concrete-pump-truck-accumulator 1 part
5 Oil Cooler concrete-pump-truck-oil-cooler 1 part
6 O-Ring Set oring-set 1 part

Used in 1 assembly