Hydraulic System Assembly
The hydraulic power unit driving the CSS adjustment cylinders and the tramp-release accumulators and cylinders that let the bowl rise to pass uncrushable tramp metal. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
6 top-level lines · 26 rows shown · 71 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Hydraulic Pump 5 parts | cone-crusher-hydraulic-pump | 1× | 1 | 25 | assembly |
| 1.1 | Stator Assembly 3 parts | stator-assembly | 1× | 1 | 3 | assembly |
| 1.1.1 | Stator Core (laminations) | stator-core | 1× | 1 | — | part |
| 1.1.2 | Copper Winding | copper-winding | 1× | 1 | — | part |
| 1.1.3 | Slot Insulation | stator-insulation | 1× | 1 | — | part |
| 1.2 | Rotor Assembly 4 parts | rotor-assembly | 1× | 1 | 19 | assembly |
| 1.2.1 | Rotor Shaft | rotor-shaft | 1× | 1 | — | part |
| 1.2.2 | Rotor Core | rotor-core | 1× | 1 | — | part |
| 1.2.3 | Neodymium Magnet | neodymium-magnet | 16× | 16 | — | part |
| 1.2.4 | Ball Bearing | ball-bearing | 1× | 1 | — | part |
| 1.3 | Pump Cartridge | cone-crusher-pump-cartridge | 1× | 1 | — | part |
| 1.4 | Oil Seal | oil-seal | 1× | 1 | — | part |
| 1.5 | O-Ring Set | oring-set | 1× | 1 | — | part |
| 2 | CSS Adjust Cylinder 4 parts | cone-crusher-css-cylinder | 3× | 3 | 5 | assembly |
| 2.1 | Cylinder Tube | cone-crusher-cylinder-tube | 1× | 3 | — | part |
| 2.2 | Cylinder Piston Rod | cone-crusher-cylinder-rod | 1× | 3 | — | part |
| 2.3 | Oil Seal | oil-seal | 2× | 6 | — | part |
| 2.4 | O-Ring Set | oring-set | 1× | 3 | — | part |
| 3 | Tramp-Release Cylinder 4 parts | cone-crusher-tramp-cylinder | 4× | 4 | 5 | assembly |
| 3.1 | Cylinder Tube | cone-crusher-cylinder-tube | 1× | 4 | — | part |
| 3.2 | Cylinder Piston Rod | cone-crusher-cylinder-rod | 1× | 4 | — | part |
| 3.3 | Oil Seal | oil-seal | 2× | 8 | — | part |
| 3.4 | O-Ring Set | oring-set | 1× | 4 | — | part |
| 4 | Tramp-Release Accumulator | cone-crusher-accumulator | 4× | 4 | — | part |
| 5 | Hydraulic Manifold | cone-crusher-hydraulic-manifold | 1× | 1 | — | part |
| 6 | Oil Seal | oil-seal | 6× | 6 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $5–$2k · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | 200 units | 6–10 wks |