BOMwiki

Air Compressor Assembly

Sourcing — likely vendors

Real suppliers (🇮🇳 🇸🇬 🇨🇳); price, MOQ & lead time are estimates
VendorHQSpecialtyEst. unit priceMOQLead time
🇮🇳Kirloskar
kbl.co.in ↗
Pune, IN Pumps & fluid systems $70 200 units 6–10 wks
🇨🇳Leo Group
leo.com.cn ↗
Taizhou, CN Pumps $51 200 units 6–10 wks
🇮🇳Shakti Pumps
shaktipumps.com ↗
Pithampur, IN Pumps $52 200 units 6–10 wks
🇨🇳CNP Pumps
cnppumps.com ↗
Hangzhou, CN Pumps $81 200 units 6–10 wks
🇮🇳Roto Pumps
rotopumps.com ↗
Noida, IN Pumps $51 200 units 6–10 wks

A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

4 top-level lines · 8 rows shown · 16 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Compressor Block diesel-electric-locomotive-compressor-block 1 part
2 Piston Assembly 4 parts diesel-electric-locomotive-piston-assembly 3 4 assembly
2.1 Piston diesel-electric-locomotive-piston 3 part
2.2 Connecting Rod diesel-electric-locomotive-connecting-rod 3 part
2.3 Piston Ring Set diesel-electric-locomotive-piston-rings 3 part
2.4 Wrist Pin diesel-electric-locomotive-wrist-pin 3 part
3 Ball Bearing ball-bearing 2 part
4 O-Ring Set oring-set 1 part

Used in 1 assembly