BOMwiki the bill-of-materials encyclopedia

Handrail System Assembly

Moving handrail on each balustrade: a rubber handrail belt driven by friction wheels at step speed, kept taut by a spring tensioner and steered by guide profiles, returning over a newel at each end. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

5 top-level lines · 8 rows shown · 14 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Handrail Belt escalator-handrail-belt 1 part
2 Handrail Friction Drive 3 parts escalator-handrail-drive 1 5 assembly
2.1 Friction Drive Wheel escalator-friction-wheel 2 part
2.2 Handrail Drive Sprocket escalator-handrail-sprocket 1 part
2.3 Ball Bearing ball-bearing 2 part
3 Coil Spring coil-spring 2 part
4 Handrail Guide Profile escalator-handrail-guide 4 part
5 Newel End escalator-handrail-newel 2 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks