Nozzle Cluster Assembly
Two 2.5 in hose outlets plus one large pumper/steamer outlet, each with a chained cap, threaded face and gasket seal. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
6 top-level lines · 6 rows shown · 13 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Hose Nozzle | fire-hydrant-hose-nozzle | 2× | 2 | — | part |
| 2 | Pumper / Steamer Nozzle | fire-hydrant-pumper-nozzle | 1× | 1 | — | part |
| 3 | Nozzle Cap | fire-hydrant-nozzle-cap | 3× | 3 | — | part |
| 4 | Cap Chain | fire-hydrant-nozzle-chain | 3× | 3 | — | part |
| 5 | Nozzle Thread Ring | fire-hydrant-nozzle-thread-ring | 3× | 3 | — | part |
| 6 | O-Ring Set | oring-set | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $3–$400 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳BOE boe.com ↗ | Beijing, CN | Display panels | 1,000 pcs | 6–10 wks |
| 🇨🇳Tianma tianma.com ↗ | Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
| 🇨🇳TCL CSOT szcsot.com ↗ | Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
| truly.net ↗ | Shanwei, CN | Displays & camera modules | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |