BOMwiki the bill-of-materials encyclopedia

Fluid End Assembly

The high-pressure wet section: plungers draw fluid through suction valves and discharge it at fracturing pressure. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

7 top-level lines · 7 rows shown · 32 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Fluid End Block fp-fluid-end-block 1 part
2 Plunger fp-plunger 5 part
3 Packing Set fp-packing-set 5 part
4 Suction Valve fp-suction-valve 5 part
5 Discharge Valve fp-discharge-valve 5 part
6 Valve Seat fp-valve-seat 10× 10 part
7 O-Ring Set oring-set 1 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks