Superstructure Assembly
Steel frame clad in chemical-resistant liner walls, with a worktop, drip cup, sink, airflow baffles and an interior light. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
9 top-level lines · 14 rows shown · 19 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Steel Frame | fume-hood-steel-frame | 1× | 1 | — | part |
| 2 | Side Panel | fume-hood-side-panel | 2× | 2 | — | part |
| 3 | Liner Wall Panel | fume-hood-liner-wall | 3× | 3 | — | part |
| 4 | Worktop / Benchtop | fume-hood-worktop | 1× | 1 | — | part |
| 5 | Drip Cup | fume-hood-drip-cup | 1× | 1 | — | part |
| 6 | Cup Sink | fume-hood-sink | 1× | 1 | — | part |
| 7 | Baffle Panel Assembly 2 parts | fume-hood-baffle | 1× | 1 | 5 | assembly |
| 7.1 | Baffle Panel | fume-hood-baffle-panel | 3× | 3 | — | part |
| 7.2 | Baffle Adjustment Bracket | fume-hood-baffle-bracket | 2× | 2 | — | part |
| 8 | Interior Light Fixture 3 parts | fume-hood-light | 1× | 1 | 4 | assembly |
| 8.1 | LED Light Module | fume-hood-led-module | 1× | 1 | — | part |
| 8.2 | Light Lens Cover | fume-hood-light-lens | 1× | 1 | — | part |
| 8.3 | Connector | connector | 2× | 2 | — | part |
| 9 | Fastener Set | fastener-set | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$200 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
| 🇸🇬Beyonics beyonics.com ↗ | Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |