Bed and Saddle Assembly Assembly
Floor-mounted bed whose longitudinal ways carry the column saddle for X-axis travel. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
7 top-level lines · 18 rows shown · 42 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Bed Casting | horizontal-boring-mill-bed-casting | 1× | 1 | — | part |
| 2 | Column Saddle | horizontal-boring-mill-saddle | 1× | 1 | — | part |
| 3 | Way Covers | horizontal-boring-mill-way-covers | 2× | 2 | — | part |
| 4 | Leveling Pads | horizontal-boring-mill-leveling-pads | 12× | 12 | — | part |
| 5 | Ball Screw | ball-screw | 1× | 1 | — | part |
| 6 | Servo Motor 4 parts | servo-motor | 1× | 1 | 24 | assembly |
| 6.1 | Stator Assembly 3 parts | stator-assembly | 1× | 1 | 3 | assembly |
| 6.1.1 | Stator Core (laminations) | stator-core | 1× | 1 | — | part |
| 6.1.2 | Copper Winding | copper-winding | 1× | 1 | — | part |
| 6.1.3 | Slot Insulation | stator-insulation | 1× | 1 | — | part |
| 6.2 | Rotor Assembly 4 parts | rotor-assembly | 1× | 1 | 19 | assembly |
| 6.2.1 | Rotor Shaft | rotor-shaft | 1× | 1 | — | part |
| 6.2.2 | Rotor Core | rotor-core | 1× | 1 | — | part |
| 6.2.3 | Neodymium Magnet | neodymium-magnet | 16× | 16 | — | part |
| 6.2.4 | Ball Bearing | ball-bearing | 1× | 1 | — | part |
| 6.3 | Encoder | encoder | 1× | 1 | — | part |
| 6.4 | Motor Housing | motor-housing | 1× | 1 | — | part |
| 7 | Encoder | encoder | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $20–$800 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatseats.com ↗ | Gurugram, IN | Seating systems | 500 sets | 8–12 wks |
| 🇨🇳Yanfeng yanfeng.com ↗ | Shanghai, CN | Interiors & seating | 500 sets | 8–12 wks |
| haritaseating.com ↗ | Chennai, IN | Seating systems | 500 sets | 8–12 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 sets | 8–12 wks |
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 500 sets | 8–12 wks |