Frame and Hub Assembly Assembly
Hub-and-pole collapsible frame expanding from 1.2 m × 1.2 m footprint, height 1.8–2.2 m when set up. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
5 top-level lines · 5 rows shown · 18 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Central Hub | ice-fishing-shelter-hub-center | 1× | 1 | — | part |
| 2 | Main Vertical Pole | ice-fishing-shelter-main-pole | 4× | 4 | — | part |
| 3 | Diagonal Bracing Strut | ice-fishing-shelter-diagonal-strut | 4× | 4 | — | part |
| 4 | Pole Connector | ice-fishing-shelter-connector | 8× | 8 | — | part |
| 5 | Internal Shock Cord | ice-fishing-shelter-shock-cord | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$200 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
| 🇸🇬Beyonics beyonics.com ↗ | Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |