Articulated Chassis Assembly
Two heavy welded frames joined at a centre hinge; steering cylinders swing the front frame about the hinge so the machine bends to turn in narrow headings. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
5 top-level lines · 7 rows shown · 11 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Front Frame | lhd-front-frame | 1× | 1 | — | part |
| 2 | Rear Frame | lhd-rear-frame | 1× | 1 | — | part |
| 3 | Articulation Joint | lhd-articulation-joint | 1× | 1 | — | part |
| 4 | Steering Cylinder 2 parts | lhd-steer-cylinder | 2× | 2 | 2 | assembly |
| 4.1 | Cylinder Barrel & Rod | lhd-cylinder-barrel | 1× | 2 | — | part |
| 4.2 | O-Ring Set | oring-set | 1× | 2 | — | part |
| 5 | Fastener Set | fastener-set | 4× | 4 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$200 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
| 🇸🇬Beyonics beyonics.com ↗ | Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |