BOMwiki the bill-of-materials encyclopedia 27,966,275 parts mapped · 127,489 items

Loader Front End Assembly

The work tool: a wide bucket on a Z-bar or parallel linkage, raised by lift cylinders and rolled by a tilt cylinder to dig and dump. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

6 top-level lines · 10 rows shown · 14 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Loader Bucket lhd-bucket 1 part
2 Bucket Tooth lhd-bucket-tooth 5 part
3 Lift Arm lhd-lift-arm 1 part
4 Steering Cylinder 2 parts lhd-steer-cylinder 2 2 assembly
4.1 Cylinder Barrel & Rod lhd-cylinder-barrel 2 part
4.2 O-Ring Set oring-set 2 part
5 Steering Cylinder 2 parts lhd-steer-cylinder 1 2 assembly
5.1 Cylinder Barrel & Rod lhd-cylinder-barrel 1 part
5.2 O-Ring Set oring-set 1 part
6 Bell Crank lhd-bell-crank 1 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks