BOMwiki the bill-of-materials encyclopedia 27,966,275 parts mapped · 127,489 items

Landing Leg Assembly Assembly

Cantilevered leg with a crushable honeycomb shock absorber and a wide footpad, deployed by springs and sized to keep the lander upright on 10° slopes at 3 m/s touchdown. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

6 top-level lines · 9 rows shown · 10 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Primary Strut lunar-lander-primary-strut 1 part
2 Secondary Strut lunar-lander-secondary-strut 2 part
3 Footpad lunar-lander-footpad 1 part
4 Crushable Honeycomb Cartridge lunar-lander-honeycomb-cartridge 1 part
5 Leg Deployment Mechanism 3 parts lunar-lander-deploy-spring 1 4 assembly
5.1 Coil Spring coil-spring 2 part
5.2 Leg Downlock Latch lunar-lander-downlock 1 part
5.3 Fastener Set fastener-set 1 part
6 Surface Contact Probe lunar-lander-contact-probe 1 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks