BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

History: Backup Bridge

1 revision. Every revision is the complete page as it stood; revert restores an old revision as a new change.

r194029 · current

by sd · 2026-10-19 14:24 · change #58
  • Created Backup Bridge (part): "A bridge structure between the rear of the main beam and the first backup deck. It carries the conveyor transfer and, on some machines, the shotcrete robot, and leaves the tunnel floor beneath it clear for laying track, invert segments or a roadbed."