Refrigerated Tank Body Assembly
Sealed stainless steel 304/316 tank (4–8 m³) with foam insulation, integral refrigeration unit, and safety-locked lid. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
9 top-level lines · 9 rows shown · 12 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tank Shell | medical-waste-truck-tank-shell | 1× | 1 | — | part |
| 2 | Tank Insulation | medical-waste-truck-tank-insulation | 1× | 1 | — | part |
| 3 | Tank Lid Cover | medical-waste-truck-tank-lid | 1× | 1 | — | part |
| 4 | Refrigeration Unit | medical-waste-truck-refrigeration-unit | 1× | 1 | — | part |
| 5 | Evaporator Coil | medical-waste-truck-evaporator-coil | 1× | 1 | — | part |
| 6 | Temperature Controller | medical-waste-truck-temperature-controller | 1× | 1 | — | part |
| 7 | Pressure Relief Valve | medical-waste-truck-pressure-relief-valve | 1× | 1 | — | part |
| 8 | Drain Valve | medical-waste-truck-drain-plug | 1× | 1 | — | part |
| 9 | O-Ring Set | oring-set | 4× | 4 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$200 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
| 🇸🇬Beyonics beyonics.com ↗ | Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |