Hydraulic System Assembly
Diesel pump, manifold, and accumulators providing synchronized expansion of both side panels and locking pressure. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
7 top-level lines · 7 rows shown · 26 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Diesel Pump Unit | military-shelter-system-diesel-pump-unit | 1× | 1 | — | part |
| 2 | Expansion Manifold | military-shelter-system-expansion-manifold | 1× | 1 | — | part |
| 3 | Pressure Accumulator | military-shelter-system-pressure-accumulator | 2× | 2 | — | part |
| 4 | Pressure Sensor | pressure-sensor | 3× | 3 | — | part |
| 5 | Filtration Module | military-shelter-system-filtration-module | 1× | 1 | — | part |
| 6 | Wire Bundle | wire-bundle | 2× | 2 | — | part |
| 7 | Fastener Set | fastener-set | 16× | 16 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $5–$2k · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | 200 units | 6–10 wks |