BOMwiki

TCON Timing Controller IC Part

Sourcing — likely vendors

Real suppliers (🇮🇳 🇸🇬 🇨🇳); price, MOQ & lead time are estimates
VendorHQSpecialtyEst. unit priceMOQLead time
🇨🇳StarPower
powersemi.cc ↗
Jiaxing, CN Power semiconductors (IGBT) $3.63 1,000 pcs 12–20 wks
🇸🇬UTAC
utacgroup.com ↗
Singapore Semiconductor assembly & test $3.77 1,000 pcs 12–20 wks
aseglobal.com ↗ Singapore Semiconductor packaging $2.86 1,000 pcs 12–20 wks
🇨🇳SMIC
smics.com ↗
Shanghai, CN Semiconductor foundry $2.84 1,000 pcs 12–20 wks
spel.com ↗ Chennai, IN Semiconductor assembly $2.60 1,000 pcs 12–20 wks

ASIC generating panel timing and gamma reference. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Used in 1 assembly