Process Control & Monitoring Assembly
PLC-based automation managing temperature profiles, centrifuge speed, discharge rates, and safety shutdowns. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
7 top-level lines · 7 rows shown · 24 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Extraction Line PLC | olive-oil-extraction-line-plc | 1× | 1 | — | part |
| 2 | HMI Touchscreen | olive-oil-extraction-line-hmi-panel | 1× | 1 | — | part |
| 3 | Temperature Sensor | olive-oil-extraction-line-temperature-probes | 4× | 4 | — | part |
| 4 | Pressure Transducer | olive-oil-extraction-line-pressure-transducers | 3× | 3 | — | part |
| 5 | Variable Frequency Drive | olive-oil-extraction-line-vfd-drives | 3× | 3 | — | part |
| 6 | Relay | relay | 4× | 4 | — | part |
| 7 | Connector | connector | 8× | 8 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $3–$400 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳BOE boe.com ↗ | Beijing, CN | Display panels | 1,000 pcs | 6–10 wks |
| 🇨🇳Tianma tianma.com ↗ | Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
| 🇨🇳TCL CSOT szcsot.com ↗ | Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
| truly.net ↗ | Shanwei, CN | Displays & camera modules | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |