Payload Fairing Assembly
Clamshell aerodynamic shroud, ~5.2 m diameter, protecting the payload through max-q and jettisoned at ~110 km where heating falls below 1,135 W/m². A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
1 top-level line · 6 rows shown · 320,082 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Fairing Half 5 parts | orbital-launch-vehicle-fairing-half | 2× | 2 | 160,041 | assembly |
| 1.1 | Composite Sandwich Panel | orbital-launch-vehicle-composite-panel | 6× | 12 | — | part |
| 1.2 | Acoustic Blanket | orbital-launch-vehicle-acoustic-blanket | 30× | 60 | — | part |
| 1.3 | Fairing Separation Rail | orbital-launch-vehicle-separation-rail | 1× | 2 | — | part |
| 1.4 | Pneumatic Pusher | orbital-launch-vehicle-pneumatic-pusher | 4× | 8 | — | part |
| 1.5 | Structural Fastener | orbital-launch-vehicle-structural-fastener | 160000× | 320,000 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |