BOMwiki the bill-of-materials encyclopedia

Cam & Cable Linkage Assembly

The shaping link: a profiled cam at the arm pivots takes up cable at a varying rate so the stack load stays even across the arms full arc, routed over pulleys to the stack. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

5 top-level lines · 7 rows shown · 11 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Load Cam pec-cam 1 part
2 Pulley 2 parts pec-pulley 2 3 assembly
2.1 Pulley Sheave pec-pulley-sheave 2 part
2.2 Ball Bearing ball-bearing 4 part
3 Steel Cable pec-cable 1 part
4 Cable Thimble pec-cable-thimble 2 part
5 Fastener Set fastener-set 1 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.10–$30 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇮🇳Motherson
motherson.com ↗
Noida, IN Wiring harness & modules 1,000 sets 4–6 wks
🇮🇳Polycab
polycab.com ↗
Mumbai, IN Wires & cables 1,000 sets 4–6 wks
🇨🇳Luxshare
luxshare-ict.com ↗
Dongguan, CN Connectors & cables 1,000 sets 4–6 wks
🇨🇳Hengtong
hengtonggroup.com ↗
Suzhou, CN Cables 1,000 sets 4–6 wks
🇮🇳Finolex
finolex.com ↗
Pune, IN Wires & cables 1,000 sets 4–6 wks