BOMwiki the bill-of-materials encyclopedia 27,966,275 parts mapped · 127,489 items

Base Structure Assembly

Frame legs and cross-bracing that support the fulcrum assembly. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

4 top-level lines · 4 rows shown · 11 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Leg playground-seesaw-base-legs 4 part
2 Cross Brace playground-seesaw-base-crossbeam 2 part
3 Foot Pad playground-seesaw-base-feet 4 part
4 Fastener Set fastener-set 1 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$200 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks