Cutting Head Assembly
The guide bar, saw chain, drive sprocket and automatic chain oiler at the top of the pole. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
5 top-level lines · 7 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Guide Bar | pole-saw-guide-bar | 1× | 1 | — | part |
| 2 | Saw Chain | pole-saw-chain | 1× | 1 | — | part |
| 3 | Drive Sprocket | pole-saw-sprocket | 1× | 1 | — | part |
| 4 | Automatic Oiler 2 parts | pole-saw-auto-oiler | 1× | 1 | 2 | assembly |
| 4.1 | Oil Reservoir | pole-saw-oil-tank | 1× | 1 | — | part |
| 4.2 | Oil Pump | pole-saw-oil-pump | 1× | 1 | — | part |
| 5 | Bar Mount & Tensioner | pole-saw-bar-mount | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |