Shedding Motion Assembly
Dobby head lifting heald frames in programmed order to open the warp shed for each pick. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
3 top-level lines · 9 rows shown · 9,665 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Dobby Head 4 parts | power-loom-dobby-head | 1× | 1 | 39 | assembly |
| 1.1 | Helical Gear Pair | gear-pair | 2× | 2 | — | part |
| 1.2 | Dobby Pattern Cam | power-loom-dobby-cam | 1× | 1 | — | part |
| 1.3 | Lifting Hook | power-loom-lifting-hook | 24× | 24 | — | part |
| 1.4 | Frame-Select Solenoid | power-loom-dobby-solenoid | 12× | 12 | — | part |
| 2 | Heald Frame 2 parts | power-loom-heald-frame | 12× | 12 | 802 | assembly |
| 2.1 | Heald Frame Stave | power-loom-frame-stave | 2× | 24 | — | part |
| 2.2 | Wire Heddle | power-loom-heddle | 800× | 9,600 | — | part |
| 3 | Frame Lifting Cylinder | power-loom-lift-cylinder | 2× | 2 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |