BOMwiki the bill-of-materials encyclopedia 27,966,275 parts mapped · 127,489 items

Shedding Motion Assembly

Dobby head lifting heald frames in programmed order to open the warp shed for each pick. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

3 top-level lines · 9 rows shown · 9,665 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Dobby Head 4 parts power-loom-dobby-head 1 39 assembly
1.1 Helical Gear Pair gear-pair 2 part
1.2 Dobby Pattern Cam power-loom-dobby-cam 1 part
1.3 Lifting Hook power-loom-lifting-hook 24× 24 part
1.4 Frame-Select Solenoid power-loom-dobby-solenoid 12× 12 part
2 Heald Frame 2 parts power-loom-heald-frame 12× 12 802 assembly
2.1 Heald Frame Stave power-loom-frame-stave 24 part
2.2 Wire Heddle power-loom-heddle 800× 9,600 part
3 Frame Lifting Cylinder power-loom-lift-cylinder 2 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks