Left Bench Assembly Assembly
Welded or bolted steel frame forming a bench seat with an integral back, upholstered in vinyl or leather, and mounted to the wall or floor at a fixed location. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
6 top-level lines · 10 rows shown · 13 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Bench Frame | restaurant-booth-bench-frame | 1× | 1 | — | part |
| 2 | Seat Base | restaurant-booth-bench-seat-base | 1× | 1 | — | part |
| 3 | Back Support | restaurant-booth-back-frame | 1× | 1 | — | part |
| 4 | Seat Cushion 4 parts | restaurant-booth-seat-cushion | 2× | 2 | 4 | assembly |
| 4.1 | Foam Padding | restaurant-booth-foam-core | 1× | 2 | — | part |
| 4.2 | Dacron Layer | restaurant-booth-dacron-wrap | 1× | 2 | — | part |
| 4.3 | Upholstery Fabric | restaurant-booth-upholstery-fabric | 1× | 2 | — | part |
| 4.4 | Removable Zipper | restaurant-booth-zipper | 1× | 2 | — | part |
| 5 | Upholstery Fabric | restaurant-booth-upholstery-fabric | 1× | 1 | — | part |
| 6 | Corner Trim | restaurant-booth-corner-trim | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |