Hinged Top Lid Assembly Assembly
Dual-hinge lid with gas struts enabling single-handed opening, integrated dual-lock mechanism. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
8 top-level lines · 8 rows shown · 8 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Lid Panel Assembly | roof-cargo-box-lid-panel | 1× | 1 | — | part |
| 2 | Left Lid Hinge | roof-cargo-box-lid-hinge-left | 1× | 1 | — | part |
| 3 | Right Lid Hinge | roof-cargo-box-lid-hinge-right | 1× | 1 | — | part |
| 4 | Left Gas Strut | roof-cargo-box-lid-gas-strut-left | 1× | 1 | — | part |
| 5 | Right Gas Strut | roof-cargo-box-lid-gas-strut-right | 1× | 1 | — | part |
| 6 | Primary Central Lock | roof-cargo-box-lid-lock-primary | 1× | 1 | — | part |
| 7 | Secondary Safety Lock | roof-cargo-box-lid-lock-secondary | 1× | 1 | — | part |
| 8 | Recessed Lid Handle | roof-cargo-box-lid-handle | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |