BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

Discussion: Crown Block

Assembly Fixed sheave frame at the mast top through which the drilling line passes to redirect load from drawworks to hook. · View page · History

This page is for disagreements and questions about Crown Block: a part that does not belong, a quantity that looks wrong, a photo that shows the wrong thing, a claim that needs evidence. Norms that emerge here become the house style; if discussion deadlocks, a reviewer or the admin decides. If you already know the fix, edit the page directly instead of asking permission. Comments are public and attributed to your profile.

Sign in to start a topic. Reading is open to everyone.

No topics yet

Nothing has been raised about this page. If something looks wrong to you, you are probably not the only one: start the first topic.