Sliding Door System Assembly
Two or three framed door leaves running in parallel aluminium tracks on bottom rollers, guided at the top. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
6 top-level lines · 15 rows shown · 44 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Door Leaf 5 parts | sliding-wardrobe-door-leaf | 2× | 2 | 17 | assembly |
| 1.1 | Door Frame Profile | sliding-wardrobe-door-frame-profile | 4× | 8 | — | part |
| 1.2 | Door Infill Panel | sliding-wardrobe-door-infill | 1× | 2 | — | part |
| 1.3 | Bottom Roller 4 parts | sliding-wardrobe-bottom-roller | 2× | 4 | 4 | assembly |
| 1.3.1 | Roller Wheel | sliding-wardrobe-roller-wheel | 1× | 4 | — | part |
| 1.3.2 | Ball Bearing | ball-bearing | 1× | 4 | — | part |
| 1.3.3 | Roller Adjuster Screw | sliding-wardrobe-adjuster-screw | 1× | 4 | — | part |
| 1.3.4 | Coil Spring | coil-spring | 1× | 4 | — | part |
| 1.4 | Top Guide | sliding-wardrobe-top-guide | 2× | 4 | — | part |
| 1.5 | Door Seal Strip | sliding-wardrobe-door-seal-strip | 2× | 4 | — | part |
| 2 | Top Track | sliding-wardrobe-top-track | 1× | 1 | — | part |
| 3 | Bottom Track | sliding-wardrobe-bottom-track | 1× | 1 | — | part |
| 4 | Soft-Close Damper | sliding-wardrobe-soft-closer | 2× | 2 | — | part |
| 5 | Anti-Jump Clip | sliding-wardrobe-anti-jump-clip | 4× | 4 | — | part |
| 6 | Dust Brush Strip | sliding-wardrobe-dust-brush | 2× | 2 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |