Telescoping Tractor Frame Assembly
Welded box-section frame that telescopes sideways to match paving widths and carries the mold between the track legs. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
5 top-level lines · 5 rows shown · 13 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Telescoping Main Beam | slipform-paver-main-beam | 2× | 2 | — | part |
| 2 | Bolster Beam | slipform-paver-bolster | 2× | 2 | — | part |
| 3 | Swing Leg | slipform-paver-swing-leg | 4× | 4 | — | part |
| 4 | Hydraulic Lift Column | slipform-paver-lift-column | 4× | 4 | — | part |
| 5 | Fastener Set | fastener-set | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $1–$200 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳JLCPCB jlcpcb.com ↗ | Shenzhen, CN | PCB fabrication | 100 pcs | 2–4 wks |
| 🇨🇳PCBWay pcbway.com ↗ | Shenzhen, CN | PCB fab & assembly | 100 pcs | 2–4 wks |
| scc.com.cn ↗ | Shenzhen, CN | PCB manufacturer | 100 pcs | 2–4 wks |
| shogini.com ↗ | Mumbai, IN | PCB manufacturer | 100 pcs | 2–4 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 100 pcs | 2–4 wks |