Guided Barbell Assembly
The Olympic barbell that travels the rails: a knurled bar with rotating loadable sleeves, carried by two linear bearing carriages and rubber-stopped at the travel ends. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
5 top-level lines · 9 rows shown · 20 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Knurled Barbell | smith-barbell | 1× | 1 | — | part |
| 2 | Loadable Bar Sleeve 2 parts | smith-bar-sleeve | 2× | 2 | 3 | assembly |
| 2.1 | Sleeve Tube | smith-sleeve-tube | 1× | 2 | — | part |
| 2.2 | Ball Bearing | ball-bearing | 2× | 4 | — | part |
| 3 | Linear Bearing Carriage 2 parts | smith-linear-carriage | 2× | 2 | 5 | assembly |
| 3.1 | Carriage Block | smith-carriage-block | 1× | 2 | — | part |
| 3.2 | Ball Bearing | ball-bearing | 4× | 8 | — | part |
| 4 | Travel Stop Bumper | smith-travel-stop | 2× | 2 | — | part |
| 5 | Fastener Set | fastener-set | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |