Boom & Conveyor Assembly
Lattice or box girder of 30–60 m carrying a reversible belt conveyor that moves material outward when stacking and inward when reclaiming. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
7 top-level lines · 7 rows shown · 66 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Boom Girder | stacker-reclaimer-boom-girder | 1× | 1 | — | part |
| 2 | Boom Belt | stacker-reclaimer-boom-belt | 1× | 1 | — | part |
| 3 | Belt Drive Unit | stacker-reclaimer-belt-drive | 1× | 1 | — | part |
| 4 | Idler Set | stacker-reclaimer-idler-set | 60× | 60 | — | part |
| 5 | Belt Take-Up | stacker-reclaimer-belt-tensioner | 1× | 1 | — | part |
| 6 | Belt Scale | stacker-reclaimer-belt-scale | 1× | 1 | — | part |
| 7 | Belt Protection Switches | stacker-reclaimer-belt-protection | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |