Railway Tank Wagon Product

Overview

A tank wagon is a rail vehicle whose cargo container is a welded steel pressure barrel. A modern European four-axle wagon of the Zacns class carries 88–98 m³ of mineral oil products at a 90 t gross mass on two Freight Bogie (Y25) units, running at 100 km/h laden. The same architecture, with thicker shells and different valve gear, carries chemicals, liquefied gases at up to 26.4 bar test pressure, and powders discharged by air pressure. Construction and operation are governed by RID (the dangerous-goods rules for rail) and the EN 12561 series.

Barrel and structure

The Tank Barrel is built from rolled Shell Course rings, 6–12 mm thick depending on product class, closed by pressed Dished End heads. Perforated Surge Baffle plates limit the longitudinal slosh of a part-loaded cargo during braking — an unbaffled 90 t liquid column can shift coupler forces violently through a train. The bottom slopes toward an Outlet Sump so the wagon drains completely. Cargoes like bitumen or palm oil that solidify in transit get an Insulation Jacket and Heating Coils fed with steam or hot glycol at the discharge terminal.

In most modern designs the barrel is self-supporting: it sits on Tank Saddle cradles over a short Underframe whose real job is to carry coupling forces. The Headstock at each end mounts Side Buffer pairs and Draw Gear rated to UIC 1350 kN proof load, with Solebar members and Bolster beams feeding vertical load into the bogie pivots.

Running gear

The Y25 bogie is the European freight standard. Its Bogie Frame carries two Wheelset assemblies — 920 mm monobloc wheels on forged axles rated 22.5 t — in Axlebox housings on nested Coil Spring pairs. Damping comes from the Lenoir Damper, an inclined link that converts part of the spring load into friction on a wear plate, so damping automatically grows with payload. Each bogie carries its own Bogie Brake Rigging applying shoes to all four wheels.

Loading and discharge

Loading happens at the dome. The operator stands on the Dome Platform, couples the rack arm to the Fill Valve, and routes displaced vapour back through the Vapour Return Valve to the terminal's recovery system. The Dip Tube verifies the level: RID caps the filling ratio at 95–97% (cargo-dependent) so thermal expansion can never hydraulically lock the barrel. The bolted Manway gives cleaning access between cargo changes.

Discharge uses the triple-barrier Bottom Discharge System. Innermost is the Foot Valve, a spring-closed valve seated inside the barrel at the sump; its design intent is that if a derailment tears off everything below the shell, the valve shears at a groove and the barrel stays sealed. Outside it sit the Bottom Ball Valve used for normal discharge and the Outlet Blank Cap as mandatory third closure. The Valve Actuator opening the foot valve is lockable and flagged so a wagon cannot move with the outlet open.

Braking and safety

The Air Brake System is the UIC automatic air brake: a 5 bar Brake Pipe runs the length of the train, and any pressure drop — commanded or caused by a parted hose — makes the Distributor Valve feed air from the Auxiliary Reservoir into the Brake Cylinder pair. A Load Sensing Valve scales the force between empty and laden so an empty wagon does not slide its wheels, and a handwheel Parking Brake secures the stabled wagon.

Dangerous-goods service adds the Safety Equipment package: a Pressure Relief Valve that vents above set pressure rather than letting a fire-engulfed barrel burst, Crash Buffer Element elements and Anti-Climber ribs that stop a colliding wagon overriding the headstock and puncturing a head, Earthing Lug points for static bonding during transfer of flammables, and orange Hazard Identification Plate panels carrying the UN number that tells emergency responders exactly what is inside.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

7 top-level lines · 51 rows shown · 114 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Tank Barrel 7 parts tank-wagon-barrel 1 15 assembly
1.1 Shell Course tank-wagon-shell-course 5 part
1.2 Dished End tank-wagon-dished-end 2 part
1.3 Surge Baffle tank-wagon-surge-baffle 3 part
1.4 Outlet Sump tank-wagon-sump 1 part
1.5 Insulation Jacket tank-wagon-insulation-jacket 1 part
1.6 Heating Coils tank-wagon-heating-coils 1 part
1.7 Tank Saddle tank-wagon-saddle 2 part
2 Underframe 6 parts tank-wagon-underframe 1 18 assembly
2.1 Solebar tank-wagon-solebar 2 part
2.2 Headstock tank-wagon-headstock 2 part
2.3 Bolster tank-wagon-bolster 2 part
2.4 Draw Gear tank-wagon-draw-gear 2 part
2.5 Side Buffer tank-wagon-buffer 4 part
2.6 Fastener Set fastener-set 6 part
3 Freight Bogie (Y25) 7 parts tank-wagon-bogie 2 24 assembly
3.1 Bogie Frame tank-wagon-bogie-frame 2 part
3.2 Wheelset tank-wagon-wheelset 4 part
3.3 Axlebox tank-wagon-axlebox 8 part
3.4 Lenoir Damper tank-wagon-lenoir-damper 8 part
3.5 Coil Spring coil-spring 16 part
3.6 Ball Bearing ball-bearing 8 part
3.7 Bogie Brake Rigging tank-wagon-brake-rigging 2 part
4 Top Loading System 7 parts tank-wagon-loading-system 1 8 assembly
4.1 Manway tank-wagon-manway 1 part
4.2 Fill Valve tank-wagon-fill-valve 1 part
4.3 Vapour Return Valve tank-wagon-vapour-valve 1 part
4.4 Dip Tube tank-wagon-dip-tube 1 part
4.5 Dome Platform tank-wagon-dome-platform 1 part
4.6 O-Ring Set oring-set 2 part
4.7 Pressure Sensor pressure-sensor 1 part
5 Bottom Discharge System 5 parts tank-wagon-discharge-system 1 6 assembly
5.1 Foot Valve tank-wagon-foot-valve 1 part
5.2 Bottom Ball Valve tank-wagon-ball-valve 1 part
5.3 Outlet Blank Cap tank-wagon-outlet-cap 1 part
5.4 Valve Actuator tank-wagon-valve-actuator 1 part
5.5 O-Ring Set oring-set 2 part
6 Air Brake System 7 parts tank-wagon-brake-system 1 8 assembly
6.1 Brake Pipe tank-wagon-brake-pipe 1 part
6.2 Distributor Valve tank-wagon-distributor-valve 1 part
6.3 Brake Cylinder tank-wagon-brake-cylinder 2 part
6.4 Auxiliary Reservoir tank-wagon-air-reservoir 1 part
6.5 Load Sensing Valve tank-wagon-load-sensing-valve 1 part
6.6 Parking Brake tank-wagon-parking-brake 1 part
6.7 Pressure Sensor pressure-sensor 1 part
7 Safety Equipment 5 parts tank-wagon-safety-equipment 1 11 assembly
7.1 Pressure Relief Valve tank-wagon-relief-valve 1 part
7.2 Crash Buffer Element tank-wagon-crash-buffer-end 2 part
7.3 Anti-Climber tank-wagon-anti-climber 2 part
7.4 Earthing Lug tank-wagon-earthing-lug 2 part
7.5 Hazard Identification Plate tank-wagon-hazard-plate 4 part

Sourcing — likely vendors

Companies that make this · indicative price $500k–$60M · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳CRRC
crrcgc.cc ↗
Beijing, CN Rolling stock & rail systems made to order 40–72 wks
🇫🇷Alstom
alstom.com ↗
Saint-Ouen, FR Rail rolling stock made to order 40–72 wks
mobility.siemens.com ↗ Munich, DE Rail systems made to order 40–72 wks
🇨🇭Stadler Rail
stadlerrail.com ↗
Bussnang, CH Rail rolling stock made to order 40–72 wks
🇺🇸Wabtec
wabteccorp.com ↗
Pittsburgh, US Rail equipment made to order 40–72 wks

717-word article