  • Created Soil Conditioning System (assembly): "Foam, polymer and bentonite plant that conditions the excavated soil so the EPB chamber holds pressure and the screw conveyor extracts it."
  • Added tbm-foam-generator × 8
  • Added tbm-dosing-pump × 10
  • Added tbm-conditioning-tank × 4
  • Added tbm-flow-meter × 22
  • Added tbm-hydraulic-valve × 40
  • Added tbm-service-pipe × 60
  • Added tbm-pipe-flange × 70
  • Added tbm-hose-fitting × 120
  • Added tbm-hex-bolt × 200
  • Added tbm-hex-nut × 200