BOMwiki the bill-of-materials encyclopedia 27,966,275 parts mapped · 127,489 items

Foundation Assembly Assembly

Three or four reinforced concrete pads anchoring the legs, designed for axial, bending, and overturning loads. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

3 top-level lines · 3 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Concrete Pad telecom-lattice-tower-concrete-pad 3 part
2 Anchor Bolt Cage telecom-lattice-tower-anchor-bolt-cage 3 part
3 Base Plate telecom-lattice-tower-base-plate 3 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks