Controller & Connectivity Assembly
A fanless industrial PC running the ticketing application against the fare backend over 4G or fibre, with remote monitoring and a UPS. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Industrial PC | ticket-kiosk-ipc | 1× | 1 | — | part |
| 2 | Connectivity Router | ticket-kiosk-router | 1× | 1 | — | part |
| 3 | UPS Pack | ticket-kiosk-ups-pack | 1× | 1 | — | part |
| 4 | I/O & Alarm Board | ticket-kiosk-io-board | 1× | 1 | — | part |
| 5 | Compute SoC Module | soc-module | 1× | 1 | — | part |
| 6 | Wire Bundle | wire-bundle | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $1–$200 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳JLCPCB jlcpcb.com ↗ | Shenzhen, CN | PCB fabrication | 100 pcs | 2–4 wks |
| 🇨🇳PCBWay pcbway.com ↗ | Shenzhen, CN | PCB fab & assembly | 100 pcs | 2–4 wks |
| scc.com.cn ↗ | Shenzhen, CN | PCB manufacturer | 100 pcs | 2–4 wks |
| shogini.com ↗ | Mumbai, IN | PCB manufacturer | 100 pcs | 2–4 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 100 pcs | 2–4 wks |