BOMwiki

Jib (Boom) Assembly

Sourcing — likely vendors

Real suppliers (🇮🇳 🇸🇬 🇨🇳); price, MOQ & lead time are estimates
VendorHQSpecialtyEst. unit priceMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg $15 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg $17 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg $17 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg $13 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg $18 1,000 pcs 6–10 wks

Horizontal saddle jib along which the trolley travels, held by pendant tie bars. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

4 top-level lines · 4 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Jib Section tower-crane-jib-section 6 part
2 Pendant Tie Bar tower-crane-tie-bar 4 part
3 Rope Sheave tower-crane-sheave 1 part
4 Limit Switch limit-switch 1 part

Used in 1 assembly