Sleeper Handling System Assembly
Conveyors and placement units that take sleeper stacks delivered by gantry, separate them, and lay each sleeper onto the formation at the correct spacing and square to the axis. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
7 top-level lines · 7 rows shown · 14 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Sleeper Conveyor | track-laying-machine-sleeper-conveyor | 1× | 1 | — | part |
| 2 | Sleeper Separator | track-laying-machine-sleeper-separator | 1× | 1 | — | part |
| 3 | Placement Unit | track-laying-machine-placement-unit | 1× | 1 | — | part |
| 4 | Sleeper Gripper | track-laying-machine-sleeper-gripper | 2× | 2 | — | part |
| 5 | Spacing Encoder | track-laying-machine-spacing-encoder | 1× | 1 | — | part |
| 6 | Drive Belt | drive-belt | 4× | 4 | — | part |
| 7 | Hall Sensor | hall-sensor | 4× | 4 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳Foxconn foxconn.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |