Sleeper Handling System Assembly

Conveyors and placement units that take sleeper stacks delivered by gantry, separate them, and lay each sleeper onto the formation at the correct spacing and square to the axis. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

7 top-level lines · 7 rows shown · 14 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Sleeper Conveyor track-laying-machine-sleeper-conveyor 1 part
2 Sleeper Separator track-laying-machine-sleeper-separator 1 part
3 Placement Unit track-laying-machine-placement-unit 1 part
4 Sleeper Gripper track-laying-machine-sleeper-gripper 2 part
5 Spacing Encoder track-laying-machine-spacing-encoder 1 part
6 Drive Belt drive-belt 4 part
7 Hall Sensor hall-sensor 4 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks