Suspension Cable & Rigging Assembly
Heavy wire rope and hardware connecting the hoist drum through boom sheaves to the wrecking ball. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
6 top-level lines · 6 rows shown · 12 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Wire Rope | wrecking-ball-crane-cable-main | 1× | 1 | — | part |
| 2 | Cable Thimble | wrecking-ball-crane-cable-thimble | 4× | 4 | — | part |
| 3 | Cable Socket | wrecking-ball-crane-cable-socket | 2× | 2 | — | part |
| 4 | Connecting Shackle | wrecking-ball-crane-cable-shackle | 2× | 2 | — | part |
| 5 | Cable Lug | wrecking-ball-crane-cable-lugs | 2× | 2 | — | part |
| 6 | Rope Splice Kit | wrecking-ball-crane-cable-splice-kit | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.10–$30 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| motherson.com ↗ | Noida, IN | Wiring harness & modules | 1,000 sets | 4–6 wks |
| 🇮🇳Polycab polycab.com ↗ | Mumbai, IN | Wires & cables | 1,000 sets | 4–6 wks |
| 🇨🇳Luxshare luxshare-ict.com ↗ | Dongguan, CN | Connectors & cables | 1,000 sets | 4–6 wks |
| 🇨🇳Hengtong hengtonggroup.com ↗ | Suzhou, CN | Cables | 1,000 sets | 4–6 wks |
| 🇮🇳Finolex finolex.com ↗ | Pune, IN | Wires & cables | 1,000 sets | 4–6 wks |