BOMwiki the bill-of-materials encyclopedia 27,966,275 parts mapped · 127,489 items

Crew Compartment Assembly

Seating and equipment for a two- or three-person crew: driver who never leaves the cab, and guards who handle the deliveries. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

5 top-level lines · 10 rows shown · 25 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Seat Assembly 5 parts seat-assembly 3 7 assembly
1.1 Seat Frame seat-frame 3 part
1.2 Seat Foam seat-foam 6 part
1.3 Seat Cover seat-cover 3 part
1.4 Seat Motor seat-motor 6 part
1.5 Seat Heater Mat seat-heater 3 part
2 Crew Console armored-cash-truck-console 1 part
3 External Intercom armored-cash-truck-intercom 1 part
4 Weapon Rack armored-cash-truck-weapon-rack 1 part
5 Roof Escape Hatch armored-cash-truck-escape-hatch 1 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks