Tunnel Frame Structure Assembly
A welded steel frame forming an enclosed tunnel, 2.5 m wide × 2.2 m high × 8 m long, supporting all wash equipment. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
7 top-level lines · 7 rows shown · 8 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Steel Frame | car-wash-tunnel-main-frame | 1× | 1 | — | part |
| 2 | Roof Panels | car-wash-tunnel-roof | 1× | 1 | — | part |
| 3 | Side Wall Panels | car-wash-tunnel-walls | 2× | 2 | — | part |
| 4 | Entrance Arch | car-wash-tunnel-entrance | 1× | 1 | — | part |
| 5 | Exit Arch | car-wash-tunnel-exit | 1× | 1 | — | part |
| 6 | LED Lighting | car-wash-tunnel-lighting | 1× | 1 | — | part |
| 7 | Fastener Set | fastener-set | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$200 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
| 🇸🇬Beyonics beyonics.com ↗ | Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |