Master Playback Deck Assembly
High-speed cassette transport reading master tape and feeding audio to all slave decks simultaneously. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
4 top-level lines · 14 rows shown · 13 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Master Tape Transport 6 parts | cassette-duplicator-master-transport | 1× | 1 | 8 | assembly |
| 1.1 | Capstan | cassette-duplicator-capstan | 1× | 1 | — | part |
| 1.2 | Pinch Roller | cassette-duplicator-pinch-roller | 1× | 1 | — | part |
| 1.3 | Transport Motor | cassette-duplicator-transport-motor | 1× | 1 | — | part |
| 1.4 | Motor Speed Control | cassette-duplicator-motor-control | 1× | 1 | — | part |
| 1.5 | Reel Motor | cassette-duplicator-reel-motor | 2× | 2 | — | part |
| 1.6 | Tape End Sensor | cassette-duplicator-tape-sensor | 2× | 2 | — | part |
| 2 | Master Playback Heads 2 parts | cassette-duplicator-master-heads | 1× | 1 | 2 | assembly |
| 2.1 | Play Head | cassette-duplicator-play-head | 1× | 1 | — | part |
| 2.2 | Head Preamp | cassette-duplicator-head-preamp | 1× | 1 | — | part |
| 3 | Master Output Amplifier 2 parts | cassette-duplicator-master-amplifier | 1× | 1 | 2 | assembly |
| 3.1 | Microcontroller | mcu | 1× | 1 | — | part |
| 3.2 | SMD Passive (R/C/L) | smd-passives | 1× | 1 | — | part |
| 4 | Master Output Level Control | cassette-duplicator-master-level-control | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.50–$200 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
| 🇸🇬Beyonics beyonics.com ↗ | Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |