BOMwiki the bill-of-materials encyclopedia

Accommodation Assembly

Berths, galley and heads fitted into the hulls. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

4 top-level lines · 14 rows shown · 39 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Seat Assembly 5 parts seat-assembly 4 7 assembly
1.1 Seat Frame seat-frame 4 part
1.2 Seat Foam seat-foam 8 part
1.3 Seat Cover seat-cover 4 part
1.4 Seat Motor seat-motor 8 part
1.5 Seat Heater Mat seat-heater 4 part
2 Berth cat-berth 4 part
3 Galley 3 parts cat-galley 1 3 assembly
3.1 Marine Stove cat-stove 1 part
3.2 Galley Refrigerator cat-fridge 1 part
3.3 Galley Sink cat-sink 1 part
4 Marine Head 2 parts cat-head 2 2 assembly
4.1 Marine Toilet cat-toilet 2 part
4.2 Holding Tank cat-holding-tank 2 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks