Wire Feed System Assembly
Uncoils stock wire, straightens it, and feeds blanks into the heading chamber at controlled intervals. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
5 top-level lines · 5 rows shown · 8 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Payoff Reel | cold-heading-machine-payoff-reel | 1× | 1 | — | part |
| 2 | Straightening Unit | cold-heading-machine-straightening-unit | 1× | 1 | — | part |
| 3 | Feed Nose | cold-heading-machine-feed-nose | 1× | 1 | — | part |
| 4 | Ball Bearing | ball-bearing | 4× | 4 | — | part |
| 5 | Wire Bundle | wire-bundle | 1× | 1 | — | part |
Used in 1 assembly
Sourcing — likely vendors
Companies that make this · indicative price $0.10–$30 · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| motherson.com ↗ | Noida, IN | Wiring harness & modules | 1,000 sets | 4–6 wks |
| 🇮🇳Polycab polycab.com ↗ | Mumbai, IN | Wires & cables | 1,000 sets | 4–6 wks |
| 🇨🇳Luxshare luxshare-ict.com ↗ | Dongguan, CN | Connectors & cables | 1,000 sets | 4–6 wks |
| 🇨🇳Hengtong hengtonggroup.com ↗ | Suzhou, CN | Cables | 1,000 sets | 4–6 wks |
| 🇮🇳Finolex finolex.com ↗ | Pune, IN | Wires & cables | 1,000 sets | 4–6 wks |