BOMwiki the bill-of-materials encyclopedia 27,966,275 parts mapped · 127,489 items

Crew Cabin Assembly

Enclosed wheelhouse and cabin seating 12–25 personnel with heating, air conditioning and safety equipment. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

7 top-level lines · 7 rows shown · 26 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cabin Shell crew-transfer-vessel-cabin-shell 1 part
2 Cabin Seat crew-transfer-vessel-cabin-seat 15× 15 part
3 Helm Console crew-transfer-vessel-helm-console 1 part
4 Heating Unit crew-transfer-vessel-heating-unit 1 part
5 Air Conditioning crew-transfer-vessel-air-conditioning 1 part
6 Cabin Window crew-transfer-vessel-cabin-window 6 part
7 Emergency Hatch crew-transfer-vessel-emergency-hatch 1 part

Used in 1 assembly

Sourcing — likely vendors

Companies that make this · indicative price $0.50–$100 · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks